Notice on launching the trial work of special fasteners for electrical contacts
- Time:2016-11-28 00:00
- Visits:
(Summary description)Tianjin Electric Power Company’s Production Technology Department Document Biotechnology [2008] No. 35 Issuer: Yang Hua’s notice on the trial of special fasteners for electrical equipment joints. Power supply units, technical centers, repair and test centers, and power design institutes: with the company With the improvement of the quality of the power transmission and transformation equipment installed in the system, the reliability of its operation has been greatly improved, but the problem of joint heating has occurred from time to time, which has gradually become a major problem affecting the safe operation of the equipment. In order to eliminate the hidden dangers of equipment, fundamentally solve the problem of overheating of the joints, and comprehensively improve the reliability of equipment operation, the company's production technology department investigated the advanced practices of other provincial and municipal power companies
Notice on launching the trial work of special fasteners for electrical contacts
(Summary description)Tianjin Electric Power Company’s Production Technology Department Document Biotechnology [2008] No. 35 Issuer: Yang Hua’s notice on the trial of special fasteners for electrical equipment joints. Power supply units, technical centers, repair and test centers, and power design institutes: with the company With the improvement of the quality of the power transmission and transformation equipment installed in the system, the reliability of its operation has been greatly improved, but the problem of joint heating has occurred from time to time, which has gradually become a major problem affecting the safe operation of the equipment. In order to eliminate the hidden dangers of equipment, fundamentally solve the problem of overheating of the joints, and comprehensively improve the reliability of equipment operation, the company's production technology department investigated the advanced practices of other provincial and municipal power companies
- Categories:Disruptive Idea
- Author:
- Origin:
- Time of issue:2016-11-28 00:00
- Views:
Document of the Production Technology Department of Tianjin Electric Power Company Shengji [2008] No. 35 Issued by: Yang Hua
Notice on the trial of special fasteners for electrical equipment joints
Each power supply unit, technical center, repair and test center, and power design institute:
With the improvement of the quality of power transmission and transformation equipment installed in the company's system, the reliability of its operation has been greatly improved, but the problem of joint heating has occurred from time to time, which has gradually become a major problem affecting the safe operation of the equipment.
In order to eliminate the hidden dangers of equipment, fundamentally solve the problem of overheating of the joints, and comprehensively improve the reliability of equipment operation, the company’s production technology department investigated the advanced practices of other provincial and municipal power companies and learned that the Sichuan Power Company adopted the national patent (ZL 01 2 14234.4L ) The product has obvious effects in solving the problem of joint heating, and some experience has been obtained.
This patented product has the following advantages: special processing of the nut, which increases the effective current-carrying cross-sectional area; thickened nut, increases the fastening force and conductor contact pressure, and reduces the contact resistance; adopts concave The nut enhances the anti-fatigue ability; the self-cleaning nut is used to eliminate the flat washer and reduce the contact resistance of the electrical contact.
In view of the above advantages of this patented product and the trial experience of relevant network province companies, the company decided to carry out trial work in various power supply units, and asked each unit to do the following work:
1. Probation period: from October 1, 2008 to April 1, 2009.
2. Trial scope: all electrical joint heating defects are dealt with; joint bolts are replaced with patented products during the overhaul of the isolating switch; bolts that need to be replaced during the maintenance of other equipment.
3. In the trial process, if the equipment clamp needs to be replaced or modified due to the installation size and process requirements of the special fasteners for the joints, this patented product may not be used.
4. All power supply units and design institutes are requested to compile installation process specifications for special fasteners for joints according to the manufacturer's construction requirements to ensure the reliability of installation quality.
5. Each unit shall analyze the trial situation of its own unit and submit the trial summary to the company's production technology department before April 30, 2009.
September 12, 2008
Subject headings: power grid equipment trial notification Company headquarters: Zhao Peng, Xue Jin, Zhang Baobao, Liu Xuezhi, Yang Deqi, Jiang Yibing, Rural Power Management Company, Safety Supervision Department, Infrastructure Department, Marketing Department.
Tianjin Electric Power Company Production Technology Department issued on September 16, 2008
Note: The new patent number is ZL200920080297.1


119 Safety and firefighting must be done practically. "Superconductivity" cannot solve man-made disasters such as electrical fires!

Pay special attention to the power safety revolution forum, and Mount Everest discusses electricity-to solve the mystery of a century of electrical disasters in the world of man-made disasters! Solve and eradicate the global ...

Special attention should be paid to national power safety in summer
ADD
128 Hongyang East Road, Qingbaijiang District, Chengdu
CHENGDU BRANCH
Room 3101, Tower 2, Raffles City, Wuhou
District, Chengdu,PR China
Copyright © 2022 Sichuan Renyi Electric Co., Ltd. 蜀ICP备12025125号 Powered by:www.300.cn SEO